Critical crane lift
Critical crane lift






  1. Critical crane lift install#
  2. Critical crane lift full#
  3. Critical crane lift professional#

The works are being performed in the buildings of the reactor, turbine, electricity, water, heating system and other structures of power units. Specialists of the holding are engaged on the objects of the Leningradskaya NPP-2 first and second power units. Main organizations of the company perform 30% of general construction and 80% of installation works on the site. With hundreds of critical lifts planned and certified to date, our. The Holding “Titan-2” is one of the main contractors for the construction of power units No. Chance, guesswork or the hunch of an overconfident rigger: these things just aren’t good enough for your next critical lift.

Critical crane lift full#

The organization performs a full range of construction and installation works from engineering to commissioning.

critical crane lift

The Holding “Titan-2” is the largest in the North-West group of companies, erecting the most important objects of the nuclear industry and energy. After the installation of mechanical and electric parts is finished, the crane will be handed over for execution of start-up and adjustment works.

Critical crane lift install#

In the near future, the specialists will have to finish assembly of the mechanical part, to install a cabin, a hook block and a repair portal. Integrated assembly, installation of the rail under the crane for movement on the overpass and crane installation to its design place have been executed. That is a closed type crane, its mechanisms are environment-proofed.Ī task of JSC "UAT" is mechanical installation of the crane. It will be also used to deliver to the containment area the equipment required for scheduled preventive maintenance, replacement of equipment of the reactor hall in the process of operation. The overpass crane of the transport sluice will participate in transportation of fuel to the reactor. “Liebherr LR 11350” crane with load capacity of 1350 tons was used to lift the crane structure weighing 150 tons to the level +40.715. Contact us to make sure your critical lift is a success.This critical operation was performed by specialists of the sector of installation tower and overhead cranes of JSC “Division of motor transport”. Trust Bobcat for Safe Crane Lifting Servicesīobcat Contracting is proud to have one of the best safety records in the industry. You’ll usually see a:Īll of them will be fully certified, and their paperwork will usually be re-checked just to ensure they are entirely qualified and legal to work the job. There will almost always be more personnel involved than usual, due to the difficulty of the job. These will be selected and briefed well ahead of time. The last major element covered by the critical lift plan is personnel. The crane will be closely inspected to verify proper functioning, and there will be long lists of setup requirements to ensure it’s ready for the job to come.

Critical crane lift professional#

Professional crane lifting services will have access to dozens of cranes, each having its own handling characteristics and capacity. Then, it’s time to choose the right crane for the job. This will include the crane itself, matting, rigging materials, weather-monitoring gear like an anemometer, and all documentation\paperwork legally required. What is a Crane Lift Essentially, a critical lift is one that could potentially cause problems if it isn’t conducted according to plan, and further, it’s a lift that requires a more detailed plan overall than a regular lift in order to avoid a catastrophic outcome. The next step is listing out every piece of equipment which will be needed on-site, then making sure it arrives in proper working order. The organization has noted that a critical lift is either a lift that exceeds 75 percent of the rated capacity of a crane that is being used on a job site or a lift that calls for the use of more than one crane. Either way, much time will be spent ensuring the crane is properly grounded and has the necessary room to move. For example, has it rained lately? They might need to wait for the ground to fully dry, to maximize stability. Cranes and hoists working in tandem are like poetry. Keep reading to learn about the engineering specifics involved in a critical lift.

critical crane lift

Without proper planning and execution, an operation can quickly turn into an OSHA statistic.

critical crane lift

They won’t just look at diagrams but examine the site itself for anything which might disrupt the lift. The critical crane lifts require planning, experienced supervision, and precise execution. Your crane lifting services will start with a detailed look at the site. The Four Key Elements of a Critical Lift Plan Professional crane lifting services will always create a detailed critical lift plan before beginning these sorts of jobs. In other words, these are the jobs that are the most dangerous and require the most pre-planning.

  • Requires lifting personnel along with the cargo.
  • Exceeds 75% of the crane’s maximum capacity,.
  • critical crane lift

    As defined by OSHA, a critical lift is any lift which: Creating a plan when operating a crane is always a very good idea, but it’s necessary when planning a critical lift.








    Critical crane lift